ACADEMIC DESIGN OFFICE


MASTER STUDIOS

20-21 SEMESTER 1  #1
20-21 SEMESTER 1  #2
20-21 SEMESTER 2  #1
20-21 SEMESTER 2  #2
21-22 SEMESTER 1   #1
21-22 SEMESTER 1   #2
21-22 SEMESTER 2  #1
23-24 SEMESTER 1   #1


WORKSHOPS

INTRODUCTION 20-21
PROTOTYPING 20-21
MODEL MAKING 20-21
ADOBE/COB 20-21
BACHELOR ADOBE 20-21
INTRODUCTION 21-22
PROTOTYPING 21-22
MODEL MAKING 21-22
ADOBE/COB 21-22
HEMPCRETE USQUARE  23-24
ADOBE / PLASTER 23-24

AGENDA

2020 - 2021
2021 - 2022


Teachers and researchers:
Wes Degreef
Emile Deroose
Ludovica Cassina
Laurens Bekemans
Laurens Luyten
Catherine Mengé


Site editors:
Dries Dupré
Lisa Fraeye
Dylan Kumps
Maria Lahni

Cecelia Vincent
Sander Lambrix
Louis Caluwaerts

Anna Eppelmann

Photographers:
Jasper Van der Linden
Louis Caluwaerts
Kas Trimpeneers


Faculteit Architectuur
Campus Sint-Lucas Brussel
Paleizenstraat 65-67 - 1030 Brussel
tel. +32 2 447 19 00

 

 

        

BIERBEEK

Kaat Boon - Lin Liu - Charlotte Winnen




BIERBEEK


In the midst of the Bierbeek farmlands, a giant pit appears in the landscape: the Godts’ sand quarry.
While hiking, we discovered the diversity of the site. The E40 cuts through the landscape that consists mostly of fields. The nearby industrial terrain contrasts with the natural scenery. From the highest point of the quarry you can see the skyline of Leuven very clearly.

It’s a very dynamic site, since the excavations are constantly changing the quarry. So as not to disrupt the workers, we embedded our watchtower in the sandy slopes on the side of the quarry, on an elevated plateau. From here, the visitors get a good overview of the excavated pit, but still feel as though they are a part of it. When the excavations are finished, nature can take back the site.

The upper structure consists of thick walls of rammed earth, held together with wooden ring beams. The lower part of our design is completely made of rammed concrete. Since there is such a difference between the sandy inside of the quarry and its green surroundings, we decided to reflect this contrast in the circulation of our design. In the embedded concrete part, the stairs will be on the inside of the building, making the visitor feel really surrounded by the materiality of the design. When he arrives at the first level, he has to continue his climb from the outside of the building, where he is really immersed by the landscape.

The tower is finished with an oak roof. The used wood is chopped in the nearby Meerdaal forest, where only a small number of trees is cut down to maintain the forest, according to Natuurpunt. For every tree in Meerdaal that is chopped, a new one will always be replanted.